News From The Richland Water Authority

 
+++++TAP FEE CHANGES EFFECTIVE JUNE 1, 2011++++

The Board of the Richland Township Municipal Authority voted to raise tap fees as of June 1, 2011 based on a rate calculation done by KLH Engineers, the Authority's consulting engineer.

The standard rate for a three-quarter inch line with a five-eighths inch meter will change to $2862.00 and the developer rate for the same size will be $1920.00.

The standard rate for a one-inch line with five-eighths inch meter will change to $2921.00 and the developer rate for the same size will be $1979.00.

 The chart below lists the tap fees for larger line and meter sizes.

 

Line size Meter size Standard tap fee Developer tap fee  
3/4" 3/4"

$3737.00

$2324.00

 
1" 3/4"

$3796.00

$2383.00

 
1" 1"

$5496.00

$3141.00

 
  1 1/2"

$8265.00

$3555.00

*
  2"

$13224.00

$5688.00

 
  3"

$24795.00

$10665.00

 
  4"

$41325.00

$17775.00

 
  6"

$82650.00

$35550.00

 
  8"

$132240.00

$56880.00

 

  10"

$190095.00

$81765.00

 

 *ALL LINE SIZES OR METER SIZES IN EXCESS OF 1 INCH ARE BILLED THE BASIC TAP FEE PLUS ACTUAL TIME AND MATERIAL CHARGES.